The new control system has been updated and enhanced with a remote maintenance interface to optimise on-site monitoring. In addition, SBB has been required to utilise the statutory minimum flow – which must be discharged via the original riverbed of the Sihl – to generate further electrical energy. A fish barrier, designed by SBB, also had to be installed for the run-of-river power station.
The requirements and positioning of the additional ball were defined and simulated in collaboration with a specialist university to ensure that there are no electrical loopholes for the fish. The new control system was designed from the outset to be able to control two balls in parallel.
By modernising the fish barriers on Lake Sihl, SBB is demonstrating that sustainable energy production and environmental protection can go hand in hand. The Etzel power station thus remains a key project for Switzerland’s railway power supply and for the protection of aquatic life.